At last, all the permits for moving two 'Excepcional' loads.
About 3 hours two move in 5 stages to the flatbed at the roadside craning over trees, wires and a field. Did I mention we managed to snag an electric cable and almost deprived a villa of electricity?
The lee hull stuck out 7 metres from the back of the not 'Excepcional' enough lowed truck, along with the two wing masts, and these proceeded first at speeds up to 60 km/hr with me driving behind nervously. Then an hour to unload at the boatyard, so too late for a second load the same day.
Same procedure the second day but slightly more difficult to get the windward hull/ pod to the roadside, and also to tie securely to the flatbed. I asked the driver to go a bit slower this time partly because the width meant it took up a bit of the other side of the road, but mainly because I would be driving nervously behind.....